About Us

Company Name: Jingjiang Haihong Plastic & Rubeer Science -Technology Co.,Ltd

Business Type: Manufacturer

Main Products: Marine PE100 Plastic Pipe , Marine PPR Plastic Pipe , Marine PVC-U Plastic Pipe , Marine PE-RT Plastic Pipe , Marine GRE Pipe , Marine Plastic Pipe

Export Percentage: 1% - 10%

Year Established: 2004

NEWS
Marine GRE plastic pipe is a commonly used pipe material in ship engineering. It has the advantages of corrosion resistance, high temperature resistance, pressure resistance, etc., and is widely used in water supply, drainage, fire protection systems, etc. of ships. In recent years, with the development of ship engineering and technological advancement, the application of marine GRE plastic pipes has also been continuously innovated and improved. Recent information shows that the application scope of marine GRE plastic pipes in ship engineering is constantly expanding. It is not only widely used in traditional water supply and drainage systems, but also in ship fuel systems, liquefied gas systems, seawater desalination systems, etc. more applications. Compared with traditional metal pipes, marine GRE plastic pipes have the advantages of light weight, easy installation, and low maintenance costs, which can effectively improve the operating efficiency and safety of ships. In addition, the production technology of marine GRE plastic pipes is also constantly innovating and improving. The pipes produced have higher pressure resistance and corrosion resistance and can adapt to harsher marine environments. At the same time, the design and installation of marine GRE plastic pipes are increasingly focusing on environmental protection and energy saving, in line with the current trends and requirements of ship engineering development. In general, marine GRE plastic pipes are an important material in ship engineering, and their application scope and technical level are constantly improving, providing important support and guarantee for the development and progress of ship engineering. It is believed that in future ship engineering, marine GRE plastic pipes will continue to play an important role, providing more reliable guarantee for the safe and efficient operation of ships.

2024-03-21

Giving full play to your technical expertise and choosing an industry field you are familiar with is the key to choosing a business direction and a successful business. Bao Haichu is a model in this regard. Before starting a business, he was the head of the technical department of a company, organized and participated in the compilation of the industry standard of "marine flame retardant rubber floor", and is a senior engineer. A strong sense of innovation and entrepreneurship and keen insight into market demand prompted him to decisively establish Jingjiang Haihong Plastic Technology Co., Ltd., which is the first domestic company to produce plastic pipes for water supply and drainage and its accessories for ships. "Jiangsu High-tech Enterprise". Bao Haichu pays special attention to technological innovation and invention and creation. Taking science and technology as the guide and innovation as the driving force, he strengthens the cooperation between production, education and research with scientific research institutions. With the help of the technology platform that the enterprise has established, he increases investment in new product development, and cooperates with various supporting facilities. Enterprises cooperate closely to achieve "produce one, develop one, reserve one", enter other fields from ship water supply and drainage, ballast, and continuously develop new products with high technology content and large market potential , so that the enterprise maintains sufficient development potential. In terms of talents, it has built a R&D team that is technologically innovative and united, established a good talent incentive mechanism, and implemented the concept of "retaining people for career, treatment, and emotion". Technicians with great potential go to domestic and foreign famous universities for further study, creating a high-quality R&D team. Since 2004, the company has obtained 2 invention patents and 8 utility model patents. The contribution rate of new products exceeds 90%. In the first half of the year, it achieved an operating income of 35.42 million yuan, a total profit of 5.45 million yuan, and paid taxes of 3.71 million yuan, and continued to move towards becoming a high-tech innovative enterprise leading the industry.

2023-08-01

Meeting Point News On the morning of September 22, Jingjiang Development Zone carried out a consultation and discussion activity on "whatever matters", and carried out consultations and discussions on "accelerating the construction of key projects in the development zone". Shen Nansong, deputy secretary of the Jingjiang CPPCC Party Group, some members of the development zone's "negotiable" consultation room, heads of relevant departments of the development zone and enterprise representatives attended the event. The participants visited the production site of new marine material pipes and pipe fittings of Jingjiang Haihong Plastic Technology Co., Ltd. located in the Precision Manufacturing Industrial Park. Haihong Plastic Technology Project is one of the major projects newly started this year. Since the construction started in April, various procedures for approval and construction have been completed, and the main structure of the plant has been basically completed. At present, during the progress of the project, it is found that there is a conflict between the north wall line and the buried power supply pipeline, which affects the construction progress. The delegates went to the enterprise for investigation and research, communicated and discussed with the person in charge of the enterprise, and had a more intuitive and in-depth understanding of the problems existing in the promotion of the project. Afterwards, they expressed their opinions around the existing problems, conducted consultations and discussions, and finally formed 3 solutions for enterprises to choose. Driven by the "one-to-one" nanny project service in the development zone, the company will overcome difficulties as soon as possible and enter the fast lane of construction. It is expected that the project will be completed and put into production within this year, and it will become another example of "started in the same year and put into production in the same year". This activity is a microcosm of Jingjiang Development Zone's in-depth promotion of the study and education of party history and the practice of "I do practical things for the masses". In the future, the development zone will continue to optimize the business environment and strive to create the "best business location" in the Yangtze River Delta. In the "three-to-one improvement" action of promoting project construction, we provide one-stop nanny service, each key project is equipped with a service team, work hard on details, pay attention to high quality and efficiency, and continuously optimize the level of business services , to ensure that key tasks such as business environment and project construction are at the forefront of Taizhou.

2023-08-01

Both ends of the vacuum box are open, and flexible gaskets can be installed. The extruded Marine GRE Plastic Pipe is led out of the water tank through the gaskets at both ends. When the Marine PPR Plastic Pipe starts to be pulled into production, the vacuum degree is quickly established, and the vacuum tank with the sizing element should be short. After the vacuum setting tank is set up, a so-called double-chamber vacuum tank is used next to the separate vacuum tank. The vacuum tank is divided into two parts, the vacuum chamber is equipped with a sizing sleeve, which is convenient for the pulling operation of PE100 pipe production. Moreover, when it is necessary to change the vacuum degree to adjust the friction force between the pipeline and the sizing sleeve, it is quite flexible, and the vacuum degree requirements of different cooling stages can be fully considered. For the additional straight-through gasket of the double-chamber vacuum tank, the subsequent vacuum chambers are separated from the sizing chamber, and the vacuum chambers are also isolated from each other. Each chamber has an adjustable exhaust valve, and its vacuum degree can be adjusted separately, and the vacuum degree should be adapted to the requirements of the cooling section. The vacuum chambers are adjustable, but they can share a single vacuum source, and several vacuum units can provide vacuum sources for the sizing chamber and subsequent cooling chamber. Vacuum box gaskets are mostly made of flexible rubber with a hole on it, the diameter of the hole is slightly smaller than the diameter of the extrusion tube to ensure the vacuum tightness of the end of the vacuum box and the different vacuum chambers in the box. In order to completely prevent air leakage, this rubber gasket is usually made quite thick. The gasket must be soft enough to seal tightly around the extruded tube without creating excessive frictional resistance. The lower the temperature of the cooling medium in the vacuum tank, the higher the suction capacity of the vacuum pump, and part of the working fluid will be discharged with the gas, so the working fluid is continuously replenished, but the water ring vacuum pump cannot be started without water. There are two cooling methods for PE100 plastic pipes, one is immersion cooling and the other is spray cooling. Bath type is usually used for small diameter pipes, pipes larger than 110mm in diameter tend to be cooled by spray. There are 4-6 gears in the submerged cooling water tank, each gear is 2-3 meters long, in order to maintain the temperature gradient and adjust the cooling speed. The cooling water tank should maintain a certain water level, and the cooling temperature can be adjusted by adjusting the flow of cooling water into the water tank. The main problem with immersion cooling is that vertical temperature differences in the tank and the buoyancy of the water can deform the pipes, especially for larger diameter pipes. The spray cooling of PE100 plastic pipes with nozzles evenly distributed along the circumference can significantly improve the cooling strength, because water will impact the outer wall of Marine PVC-U Plastic Pipe at a relatively high speed, preventing the formation of a warm water layer at the interface.

2023-08-01

The choice of materials has always been an important part of marine interior decoration, which determines the user's intuitive feeling and affects the comfort. Therefore, in the purchase of materials, we should not take it lightly. In order to save money, we should choose relatively Inexpensive materials are not desirable. We should choose environmentally friendly and energy-saving materials to give users a better feeling and ensure greater comfort. In fact, the root cause of many problems lies in the purchase of materials. The unqualified materials are bought for the interior of the ship, which leads to the occurrence of later problems. We can only guarantee the quality of the later stage if we choose materials with guaranteed quality. There are many fake materials on the market today. Fake material directly affects the health of users, not just feelings. Therefore, it is necessary to put safety issues first, instead of paying attention to how much money is spent, don't leave yourself a safety hazard, and choose interior materials carefully.

2022-05-27

Both ends of the vacuum box are open, and flexible gaskets can be installed, and the extruded glass fiber reinforced plastic pipe is led out of the water tank through the gaskets at both ends. When the glass fiber reinforced plastic pipe starts to be pulled into production, the vacuum degree is quickly established, and the vacuum tank with the sizing element should be short. After the vacuum setting tank is set up, a so-called double-chamber vacuum tank is used next to the separate vacuum tank. The vacuum tank is divided into two parts: First, the vacuum chamber is equipped with a sizing sleeve, which facilitates the pulling operation of plastic pipe production. Moreover, when it is necessary to change the vacuum degree to adjust the friction force between the pipe and the sizing sleeve, it is quite flexible, and the vacuum degree requirements of different cooling stages can be fully considered. For the additional straight-through gasket of the double-chamber vacuum tank, the subsequent vacuum chambers are separated from the sizing chamber, and the vacuum chambers are also isolated from each other. Each chamber has an adjustable exhaust valve, and its vacuum degree can be adjusted separately, and the vacuum degree should be adapted to the requirements of the cooling section. The vacuum chambers are adjustable, but they can share a single vacuum source, and several vacuum units can provide vacuum sources for the sizing chamber and subsequent cooling chamber. Vacuum box gaskets are mostly made of flexible rubber with a hole on it, the diameter of the hole is slightly smaller than the diameter of the extrusion tube to ensure the vacuum tightness of the end of the vacuum box and the different vacuum chambers in the box. In order to completely prevent air leakage, this rubber gasket is usually made quite thick. The gasket must be soft enough to seal tightly around the extruded tube without creating excessive frictional resistance. The lower the temperature of the cooling medium in the vacuum tank, the higher the suction capacity of the vacuum pump, and part of the working fluid will be discharged with the gas, so the working fluid is constantly replenished, but the water ring vacuum pump cannot be started without water. There are two cooling methods for FRP plastic pipes, one is immersion cooling and the other is spray cooling. Bath type is usually used for small diameter pipes, pipes larger than 110mm in diameter tend to be cooled by spray. There are 4-6 gears in the submerged cooling water tank, each gear is 2-3 meters long, in order to maintain the temperature gradient and adjust the cooling speed. The cooling water tank should maintain a certain water level, and the cooling temperature can be adjusted by adjusting the flow of cooling water into the water tank. The main problem with immersion cooling is that vertical temperature differences in the tank and the buoyancy of the water can deform the pipes, especially for larger diameter pipes. The spray cooling of the plastic pipe with nozzles evenly distributed along the circumference can significantly improve the cooling intensity, because the water will impact the outer wall of the FRP plastic pipe at a relatively high speed, preventing the formation of a warm water layer at the interface.

2022-05-20

Before the PE100 plastic pipe is installed, the pipe supports should be embedded, and the installation spacing of the hot and cold water pipe supports should meet the requirements of the specification. It should meet the vertical and horizontal bending of horizontal pipes, the verticality of risers, the installation deviation of rows of pipes and valves, but should not be greater than the allowable pressure of the pipes. After the PE100 plastic pipe is installed, it should be slowly filled with water, and the water tightness should be checked after the water is filled. We use a manual pump to slowly pressurize to the test pressure, hold the pressure for 1 hour, and check that there is no leakage. The pressure drop within 30 minutes is less than 0.05MPa, which is qualified. The PE pipe must be heated when connecting. If the temperature is too low, it will not melt, and burrs will easily occur. Excessive temperature of PE100 plastic pipe will easily lead to resin deterioration and poor connection. Avoid contact with paint, asphalt and other organic substances during storage and installation; do not store in the open air to prevent direct sunlight. When the temperature difference between the construction site and the pipeline storage place is large, it should be placed on the construction site for a period of time to make the temperature close to the construction site temperature. Axial distortion is not allowed when the pipe is installed, and forced correction is not allowed when passing through the wall. When installed in parallel with other metal pipes, there should be a certain protective distance, and should be installed on both sides of the metal pipe, and cannot be rotated for hot-melt splicing and correction. When welding elbows, tees and other pipe fittings, attention should be paid to their direction, and their positions should be marked with auxiliary marks on the straight line direction of the pipe fittings and pipes. The PE pipe shall be provided with expansion joints according to the design requirements. Generally, the expansion joints shall be set at the combined attachments for each layer. The expansion joints of the sinking drainage pipes on the same layer and the ground drainage pipes on the same layer are located 7-10 cm above the confluence pipe fittings; if they are on the backfill layer, expansion joints can be set at 15-20 cm from the decorative ground. If the branch pipe is close to the floor slab on the same floor, an expansion joint can be arranged in the middle of the pipe. The setting of horizontal pipeline expansion joints should also meet the design requirements. When installing, it should be noted that the rubber ring of the PE100 plastic pipe expansion joint should be in the direction of water connection. The two ends of the casing in the wall are flat on the decorative surface, and there should be no problem with the hanging drainage under the floor. The casing cannot be installed in the sinking drainage on the same floor, and can only be waterproofed. The waterproof layer should be below the horizontal branch pipe, and the riser extends to form the ground part. The waterproofing of the surface layer should be done well, otherwise the sinking structure will become a puddle, and there will be leakage in the future, which is troublesome.

2022-05-13

1. Winding butt This street form is to align two tubes and then wind them to the appropriate thickness and width with resin-impregnated reinforcing materials of different scales (glass cloth, felt or felt roving). This kind of joint has good sealing performance and can withstand large internal pressure. It is generally used for the connection of straight pipes, elbows, tees and reducers. 2. Flare socket joint There are many options for this kind of joint. One end of the tube is generally made into a bell-shaped bell mouth, and the next connecting tube is inserted into it, usually sealed with a round (or other shape) rubber gasket. Therefore, this method is sometimes referred to as an "O-ring" connection. 3. The casing connection is a casing with a diameter slightly larger than the pipe diameter, the inner surface is coated with cement, and the outer ends of the two glass fiber reinforced plastic pipes are also coated with cement. Then insert two glass fiber reinforced plastic pipes into the casing, and the cement can be used after curing. 4. Hose joint This joint only covers a rubber sleeve at the opposite ends of the two pipes, and the two ends of the sleeve are clamped with stainless steel belts and fastened with screws. In addition, there are flange joints, adhesive joints, etc., but they are generally not used for underground pipelines.

2022-04-29

Contact Us
WEI BAOMr. WEI BAO

Mr. WEI BAO

bw_1994@163.com

Related Products List

Home

Product

Phone

About Us

Inquiry

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send